SCOPE OF WORK:
To modify the existing two bathrooms per the proposed plan. Create one Handicap accessible bathroom and modify the existing men’s bathroom to be a Family Bathroom. To include minor modifications of the block entry walls, providing a new entry door, relocating an existing entry door new hardware for the Handicap entry door, removal of stool, urinal, toilet stall partitions, cap unused drain and water lines. Provide and install 2) new wall mounted sinks,
2) handicap usable faucets, pipe cushion covers, new LVT or vinyl flooring in both bathrooms, grab bars and ready for prep and paint by others. GCS to provide the sink, faucet and LVT flooring. Painting by others once project is completed.