Tillman Road Master Bathroom & Suite Remodel

Scope of work: Demolition: Closet Removal, one in guess room, one in office room & on hall (pantry) Sink Light with Med. Cabinet, Sink Faucet, Vanity, Vanity Top, Stool. Uninstalling Shower Unit & Shower Tile; Taking Wall down for an opening to sound closet (behind shower) Relocating New Exhaust Fan, removing 3 Window ( office, guess room & master). Framing: We are installing a Micro Lam Beam over guess entry door for and opening; Utilizing Closet Space we are framing new wall all way to hall; In New Bathroom half wall for toilet, Shower Enclosure, Shower Bench inside & shelving next to Toilet, Two Niches and a Toe Niche. Replacing Window in office for same size, New Opening for a new window (32inx14in) in guess room, as well as replacing other two window (guess and master) for a smaller window (32inx14in). We are Extending Duct Work, Return Vent in Master and guess room, we are Relocating Vent in guess room; New Drains & Vents are going to be needed to accommodate the New Full Bath. Zero Entry Shower; Installation of New Free-Standing Tub with Floor Tub Filler; We are Relocation New Sink, Toilet & Shower (drains) 5 New Light fixtures Will be installed ( 2 in Sink and 3 in Designated areas by client); Heated Floor Installation on tub and Shower Area; We are installing New Ceramic Floor in New Master Bathroom

Estimated Total Contractor’s Work For Master Bathroom & Suite Project:
$73,664.00 - $101,288.00

Tillman Road Master Bathroom & Suite Pictures

Let Gercken Construction Services Create AN AMAZING BATHROOM that you will love!

Scroll to Top