Scope of Work- Remodel Main Floor Bathroom to add WalkIn Shower. This includes removing: Current Tub and
Surround; Tile Walls; Faucet, Valve & Drain. Fir out west
Shower Wall and Tile. Skim Coat South Wall to the right of
the Mirror, Sand ready for Paint.
ESTIMATED TOTAL CONTRACTOR’S WORK: $7,900.00-10,900.00