Justus Bathroom Remodeling Project

Estimated Contractors Work for this Master Bathroom Project $27,000-$29,500

Scope of Work- Master Bath

To replace the existing sink light and mirror, remove the existing whirlpool tub, fill in the floor and reset at floor level, demo the existing shower finished walls and base, enclose the shower with half wall, install new shower faucet, diverter, hand held shower assembly, corner bench seat, corner seat faucet and spray wand, new ceramic wall and shower base tile, tile niche, floor tile and wall painting. 

The Work

Before Pictures

Ready to get started?

Let Gercken Construction Services Create AN AMAZING BATHROOM that you will love!

Scroll to Top