Antioch Hallway Bathroom Remodel

REMODEL HALL BATH to include REMOVING: Tub, Tub/Shower Valve, Water Supply Lines & Showerhead; Shower Wall Panels; Window; Tile Floor; Pedestal Sink & Stool (save to reset); Mirror; Vanity Light.

REPLACE WITH FURNISHING AND INSTALLING NEW: Jetted Tub with associated Electrical & Plumbing; Wall Panels; Tub/Shower Valve; Supply Lines; Raised Showerhead; 2 Grab Bar; Towel Bar; 2 Flush Mount LED Lights; New Vent Fan; LED Mirror; replace Sheetrock as needed; Close up Window; Towel Bar; LVT Flooring; Paint Bathroom Walls.

ESTIMATED TOTAL CONTRACTOR’S WORK :
$15,996.00 - $21,994.50

Antioch Hallway Bathroom Remodel After Images

Antioch Hallway Bathroom Remodel Before & After Images

Let Gercken Construction Services Create AN AMAZING BATHROOM that you will love!

Scroll to Top