Quail Ridge Basement Finish Project

Scope of Work

FINISH SELECTED AREAS OF THE BASEMENT to include Installing New: Carpet on the Stairway leading to the Basement; Build Hallway; Build Bedroom; Build Kitchenette and Bathroom, all with LVT Flooring, which includes Jackhammering floor to run plumbing; Bathroom to have a 6′ x 6′ all Tile Walk-In Shower with new Shower Valve, Showerhead, Bench Seat, Accent Stripe & Shampoo Niche; Stool, Vanity, Top & Faucet; Mirror, Vent Fan LVT Flooring. We will run Electric outlets and switches to code in the finished areas. We will Sheetrock Walls and Ceilings to the aforementioned areas and Install doors: Between Stairway & unfinished area, to the Bedroom, to the Bathroom and to the Kitchenette. We will wire the Kitchenette to code.

Estimated Total Contractors Work for Basement Remodel Project:
$96,772.00 - $105,570.00

Quail Ridge Basement Finish - Picture Gallery

Quail Ridge Basement Finish - Before & After Images

Ready to get started?

Scroll to Top