Gashland Hall Bathroom Shower Remodel

Scope: To remove the existing tub and install a walk-in shower. Remove the tub, ceramic tile tub/shower walls and faucet. Leave existing flooring and finished wall intact, including the arch above the tub. Install a 30 x 60 left hand white fiberglass shower base, new shower faucet, tile backing wallboard, ceramic shower wall tile and provide a bypass clear glass shower door, your choice of standard frame metal color.

ESTIMATED TOTAL CONTRACTOR’S WORK :
$7,536.00 - $10,362.00

Gashland Hall Bathroom Shower Remodel After Images

Gashland Hall Bathroom Shower Remodel Before & After Images

Let Gercken Construction Services Create AN AMAZING BATHROOM that you will love!

Scroll to Top