Scope of Work- Remodel HALL BATHROOM to include Demo of: Tub Unit, Tub/Shower Valve; Vanity, Top & Faucet; Outlet; Mirror; Vanity Light; Stool; Vinyl Floor; Base Trim.
REPLACE WITH INSTALLING NEW: Tub, Tub/Shower Valve & raised Showerhead; Vanity, Top & Faucet; GFi Outlet; Stool; Flooring & Base Trim.
ESTIMATED TOTAL CONTRACTOR’S WORK
:
$11,035.20 - $15,173.40